| 1. | Method of correcting cavity ' s image in water tunnel experiment 水洞实验中空泡图象的一种修正方法 |
| 2. | If you re travelling with your kids , bring them to the sea world which features the longest water tunnel in southeast asia 如有小孩同行,可带他们前往海洋世界sea world ,欣赏逾5000种 |
| 3. | Automatic control system for ventilating which has been used in the study of water tunnel supercavitating experiments has been designed in this paper 本文设计了用于水洞超空泡试验研究的充气自动控制系统。 |
| 4. | With the r & d of the water tunnel data acquisition system which is based on the virtual instruments technology , the paper presents the method to develop vi systems 结合计算机技术和传统测试技术发展起来的虚拟仪器,是当今乃至以后测试系统的发展方向。 |
| 5. | It had a diameter of 54 inches . it also started from man kan to in the new territories , went through river indus pumping station to water tunnel at tai po tau to connect with plover cove 1964年增设的第二条直径54寸水管,起自新界文锦渡经梧桐河抽水站至大埔头输水隧道,与船湾淡水湖系统连接。 |
| 6. | In accordance with the water tunnel that liner have cooling pipe , thermal insulation temperature rise model adopt difference expression during its through or not water phase , and optimization back analysis of parameters is carried out 针对本工程引水洞衬砌内布置有冷却水管,对绝热温升模型在通水前后采用了不同的表达式,并分别对其进行了优化反演分析。 |
| 7. | The aerated behaviours in cavitation region of high velocity flow through the non - circulating water tunnel are investigated by using the advanced experimental facilities in the hydraulics laboratory at zhejiang university of technology 摘要本文用先进的量测仪器在浙江工业大学水力学实验室直流式水洞中分别对高速水流空化区、空蚀区的掺气特性进行了较为系统的试验研究。 |
| 8. | In this paper , a theoretical investigation of the drag and noise reduction by riblets is carried out , and these numerical results are compared with those obtained from experiments with riblets in water tunnel , and it is found that they agree with each other in tendency and numerical value 本文从理论上分析了条纹表面的减阻降噪特性,并将计算结果与水洞模型贴膜实验进行了对比,两者在趋势和数值上基本一致。 |
| 9. | The high island water system had a transport network that included numerous underground tunnels , in total 25 miles long , with diameters of 10 to 13 ft . the main water tunnel was 74 , 000 ft . long ( 14 miles ) , beginning at pak tam chung , near high island , and going through the sai kung peninsula and tai wan to reach the sha tin treatment works 万宜水库的输水网络包括了多条直径10至13尺、共长约25哩的输水隧道,隧道主线长74 , 000尺( 14哩) ,由万宜水库北潭涌起,横越整个西贡半岛,经西贡大环至沙田滤水厂。 |
| 10. | To provide necessary data for design bypass pipe , an enlargement to bi liu river reservoir , the following problems have been studied by hydraulic model and theoretical analysis : the energy losses in water head of the bypass pipe system and of the flow - control valve and their scale effects , measurement and calculation of the discharge of the bypass pipe system during the bypass pipe system operation with and without the new water power station , the hydraulic characteristics of the water tunnel and draw - off pipe , the flow rate of the aqueduct bridge and the draw - off pipe and the water elevation of the flow in the aqueduct bridge during the old water power station operation with and without the new water power station 大连市碧流河水库供水工程取水头部由引水渡槽、节制闸、进水闸、泄水闸等建筑物组成。由于本工程场地条件限制,增设旁通管后布置非常紧凑,管道急转角度大且转弯距离较小,对于管内水流流态是否满足要求,需要经过模型试验进行论证,以确保工程的可靠性。旁通管具有上水与泄水要求,对其过流能力也要经试验确定,为碧流河水库增建旁通管设计提供依据。 |